work packages
To become a success, significant steps have to be made in all research and technology areas. Significant progress is both necessary within one area and between areas to arrive at a capacitive mixing device with power density of 100 W/m3 and 70% efficiency. There are six work packages (WP’s) defined in the project.
The way these 6 WP’s are connected is displayed in the figure bellow.
PERT diagram showing the principal relationships between the different work packages. The work packages are denoted by the rectangles. The principal outcomes of the first three WPs are indicated as rounded rectangles, as they represent the principal mean of information flow between the WPs